Thursday, October 15, 2009

SWIFTLET'S HOUSE TWEETER INSTALLATION


This is the recommended layout for tweeter installations for a new double-storey swiftlet's house.
2 kinds of tweeter are used both internally and externally. External tweeters are installed on the entrances and the rear walls. There are also external tweeters needed on the ground floor at the back of the control rooms, loading bays and the front end of the swiftlet's house.
Internal tweeters are also installed on the timber planks, note that these tweeters are facing different directions in the house.
Sincerely hope that this diagram is of assistance and information to all of you.

No comments:

Post a Comment